Powell's C of E School, Cirencester

Image

FAST FACTS

3.3m x 1.2m 

SAFB with bespoke cladding installed

1.8m x 1.1m

Timber Flood Gate installed

THE PROBLEM

Powell's C of E Primary School, which is situated close to The River Churn, has previously suffered the effects of flooding; damage was caused to the forest area and playground, and the school was also forced to close. It became apparent that the school required flood mitigation to protect it from any future flooding events.

Image

Entrances to the school grounds that required protection

Image


Contracted by Gardiners, UKFB was appointed to design and install flood mitigation measures. The site required two different forms of flood defence systems in order to effectively protect the school.

UKFB’s Self Activating Flood Barrier (SAFB) and Timber Flood Gate were chosen as the optimum solutions that would best meet the specific requirements of the site.

The SAFB designed and installed by UKFB measured 3.3m x 1.2m.  A passive solution, it requires no human, mechanical or electrical intervention to operate. The barrier uses the power of the approaching flood water to deploy while also remaining invisible and fully self-protected in non-flood conditions.

The SAFB for this project has a steel basin, which is strong enough to withstand the light traffic which will drive over the barrier on a daily basis.

In addition, the top of the barrier was designed with anti-slip protection, so it’s safe for the school’s young pupils to cross over.

Image

Basin ready for the barrier to be lifted into place. It’s backfilled with concrete up to finished floor level.

The operation of the SAFB relies on a guide rail at each end of the aperture to seal against, under flood conditions. Again, because the school’s pupils will cross the threshold of the barrier, the rails could pose a health & safety risk, so bespoke cladding was designed to cover the guide rails on a day-to-day basis but also raise with the barrier in a flood event. 

Image
Image

Self Activating Flood Barrier installed in its resting position. With anti-slip protection on the top & cladding to the guide rails.

Image
Image

In addition to the SAFB, another entrance to the school grounds was best suited to the Timber Flood Gate solution; a double leaf gate measuring 1.8m x 1.1m was required. 

The Timber Flood Gate is a passive solution; once the operator shuts the gate, it seals and protects the school from flooding up to the height of the gate. The Timber Flood Gate is easily closed and the drop down bolts and locks are used to form a strong connection.

Image

UKFB’s Timber Flood Gate in manufacture with adjustable hinges. Once put together with other leaf, will form a 1.8m x 1.1m fully sealed flood gate.

Image

Timber Flood Gate fully installed with lock and adjustable hinges.

iso 14001

ISO 14001:2015

ISO 9001

ISO 9001:2008

bsi kitemark

Kitemark Certified Survey & Installation

chas accredited

Chas Accredited

Guarantee Protection through GGFI

Guarantee Protection through GGFI

Contructionline

UK Register of
Pre-qualified construction services

UK Flood Partnership
Business In The Community